Реализованные проекты

Prizeyskaya – Elgaugol two 220 kV overhead lines with the extension of 220 kV Prizeyskaya A and B substations, including extension of 220 kV outdoor switchgear at 220 kV Prizeyskaya substation. Customer – CIUS East – Branch of UES CIUS Company. The line length is 251 km. Two circuits on free-standing supports. The line includes two large crossovers across the Zeya Reservoir (2 km) and across the Demka River (1.2 km).
Выполненный проект: Да
110 kV Petelinski Switching substation with the overhangs of 110 kV overhead lines. Customer - Tyumenenergo - Nefteyugansk Electrical Grids Company
Выполненный проект: Да
220 kV overhead line, 220/110/35/10 kV Komsomolskaya stepdown substation – 220/110/35/10 kV Selikhino stepdown substation – 220/110/35/10 kV Vanino stepdown substation (Vanino Energy Cluster Project). The line length is 389 km. Customer – FGC-UES – Eastern Main Grids. Seven high-voltage crossovers, including those with the length of 1,600 meters across the Amur river were built. On the crossovers 170-meter high supports were installed. The total number of steel lattice supports installed is 1,517.
Выполненный проект: Да
L-115 110 kV overhead line (limiting voltage – 220 kV) to the crossing over the Lena river. The line length – 429 km. Customer – Yakutskenergo Company
Выполненный проект: Да
Customer - Tyumenenergo - Nefteyugansk Electrical Grids Company
Выполненный проект: Да
The line length is 389 km. Customer – FGC-UES – Eastern Main Grids. Seven high-voltage crossovers, including those with the length of 1,600 meters across the Amur river were built. On the crossovers 170-meter high supports were installed. The total number of steel lattice supports installed is 1,517.
Выполненный проект: Да
The total length of the line is over 1,000 km. Customer – DVEUK Company.
Выполненный проект: Да
Выполненный проект: Да
Выполненный проект: Да
Выполненный проект: Да
Выполненный проект: Да
=